Key Actions

  • Connecting public buildings according to local planning rules based on the network's planned new developpments
    • Description:

      The city of Dijon, which has more than 900 municipal buidlings, as well as Dijon metropole which has 250, have committed to systematically connecting their buildings to the urban heating network which has been under developpment since 2013. Thus, the surface area heated on a heating network has increased from 24 000 m2 in 2013 on a network not yet using renewable energy to 175 000mé in 2018. Thus, to date, the coverage rate of renewable energy on heating is 30%

    • Key Action:1
    • Language:en
    • Sectors: municipal buildings equipment facilities
    • Implementation timeframe:2013-2023
    • Implementation cost:2200000
    Rate this benchmark: Votes
  • Reducing energy consumption in municipal properties
    • Description:

      The city of Dijon has entered into a contract with a public partnership in order to manage the energy consumption of buildings with the objective of reducing energy consumption. The first contract which ended in 2016 had made it possible to reduce energy consumption by nearly 30% and reduce by 13% the use of the gas oil. The new contact, started in 2016 and which will last 8 years, aims to reduce energy consumption by 16% (7GWh/year) by definitively supplanting the use of the fuel oil. Investments are being made by the collectivity in partnership with the company. Other actions are being set up such as the heating of sports buildings based on the schedulling of room reservations by clubs.

    • Key Action:1
    • Language:en
    • Sectors: municipal buildings equipment facilities
    • Implementation timeframe:2016-2024
    • CO2 reduction:4500
    • Renewable energy produced:1955
    • Implementation cost:2000000
    Rate this benchmark: Votes
  • Incentive of connecting to the urban heating network
    • Description:

      With the creation in 2013 of the new urban heating network whose heat comes from 70% of renewable energy, Dijon metropole has embarked on a policy with an incentive of connecting to the heating network. Relying on the network's attractive costs, the objective was, on the one hand, to identify major energy consumers such as hospitals and universities....which would make it possible to maintain an appealing and efficient network and, on the other hand, more generally encourage any potential consummer to change their heating system in order to increase the territory's renewable energy level.

    • Key Action:1
    • Language:en
    • Sectors: tertiary buildings equipment facilities
    • Implementation timeframe:2013-2023
    Rate this benchmark: Votes
  • Encouraging the emergence of positive-energy buildings
    • Description:

      Dijon metropole is implementig actions to encourage the territory's economic stakeholders to be part of the objective of constructing postive-energy buildings during the thermal renovation or new constructions by developping renewable energy and storage methods. The costs are mainly internal HR costs to the collectivity and the action of assistance cannot be evaluated in terms of carbon objectives and energy savings.

    • Key Action:1
    • Language:fr
    • Sectors: tertiary buildings equipment facilities
    • Implementation timeframe:2018-2025
    Rate this benchmark: Votes
  • 88 territorial stakeholders committed to achieving the climate targets set by Dijon metropole
    • Description:

      In 2012, 88 territorial stakeholders signed the Illico2 charter of the territorial energy climate plan. They have all committed, alongside Dijon metropole, to achieving the set objectives of reducing greenhouse gas emissions by 2020 , in relation to the territory.

    • Key Action:1
    • Language:en
    • Sectors: tertiary buildings equipment facilities
    • Implementation timeframe:2012-2020
    Rate this benchmark: Votes
  • Assisting landlords with the thermal renovation of public stock
    • Description:

      Since 2010, Dijon metropole has finacially assisted public landlords with the thermal renovation of low-income public housing stock. Thus, over the period 2010-2017, 3 413 properties were able to be renovated with an energy saving of 45% on average. For the period 2018-2024, 2 901 properties will be renovated.

    • Key Action:1
    • Language:en
    • Sectors: residential buildings
    • Implementation timeframe:2010-2024
    • CO2 reduction:7100
    • Implementation cost:23000000
    Rate this benchmark: Votes
  • Assiting landlords with the thermal renovation of public stock
    • Description:

      Since 2010, Dijon metropole has financially assisted public landlords with the thermal renovation of low-income public housing stock. Thus, over the period 2010-2017, 3 413 properties were able to be renovated with an energy saving of 45% on average. For the period 2018-2024, 2 901 properties will be renovated

    • Key Action:1
    • Language:en
    • Sectors: residential buildings
    • Implementation timeframe:2018-2023
    • CO2 reduction:2900
    • Implementation cost:23000000
    Rate this benchmark: Votes
  • Deploying the platform for assisting private co-ownerships with the thermal renovation
    • Description:

      Since 2010 to 2015, private landlords could have technical informations to reduce energy consumption. Dijon metropole set up in 2016 a plateform for assisting private landlords with the thermal renovation of their properties and notably co-owernships. Testing is being carried out on this, intended for five vulnerable co-owernships with a view for them to undergo planned thermal improvement works.

    • Key Action:1
    • Language:en
    • Sectors: residential buildings
    • Implementation timeframe:2010-2021
    • CO2 reduction:25000
    • Implementation cost:13000000
    Rate this benchmark: Votes
  • Continuing with the construction of eco districts
    • Description:

      Dijon metropole has implemented a policy for the construction of eco-districts on the site of former wasteland, notably military but also hospital and other wasteland. The objective wa to construct the city on the city, participate in the objectives of constructing a short-distance city with ambitious energy objectives. More than a dozen planned eco-districts were created in 2010 with the objective of them taking shape by 2025 for the last constructions.

    • Key Action:1
    • Language:en
    • Sectors: residential buildings
    • Implementation timeframe:2010-2023
    Rate this benchmark: Votes
  • Assisting with the thermal renovation of private co-owernerships
    • Description:

      Dijon metropole has committed to financially and technically assisting private co-owernships whose owners are on a law income with the thermal renovation of their buildings. Studies for assisting three co-ownerships located in a political district have been carried out.

    • Key Action:1
    • Language:en
    • Sectors: residential buildings
    • Implementation timeframe:2019-2024
    • CO2 reduction:2400
    • Implementation cost:23500000
    Rate this benchmark: Votes
  • Encouraging inhabitants to reduce their energy consumption
    • Description:

      Dijon metropole has committed to a first action of raising awarness among inhabitants on energy and water savings. This action, which has lasted five years, has concerned 500 households and has made it possible to reduce energy consumption and greenhouse gas emissions. A new action has resulted from this action : living comfortably in one's property, with the objective of assisting 10 000 households over the next five years until 2020.

    • Key Action:1
    • Language:fr
    • Sectors: residential buildings
    • Implementation timeframe:2010-2020
    • CO2 reduction:4165
    • Implementation cost:1000000
    Rate this benchmark: Votes
  • 65% reduction of public lighting consumption by 2030
    • Description:

      Since 2010 to 2014, the City of Dijon reduced public public lighting energy consumption by 30% . In 2015, Dijon metropole has committed to a large-scale contract with the objective of reducing public lighting energy consumption by 65%. To do so, in addition to the bulb and candelabra changes that are necessary for the 38 000 light points in the city, a system for remotely controlling lighting times will be set up.

    • Key Action:1
    • Language:en
    • Sectors: public lighting
    • Implementation timeframe:2010-2030
    • CO2 reduction:600
    • Implementation cost:35000000
    Rate this benchmark: Votes
  • Incentive of connecting to the urban heating network
    • Description:

      With the creation in 2013 of the new urban heating network whose heat comes from 70% of renewable energy, Dijon metropole has embarked on a policy with an incentive of connecting to the heating network. Relying on the network's attractive costs, the objective was, on the one hand, to identify major energy consumers, which would make it possible to maintain an appealing and efficient network ans, on the other hand, more generally, encourage any potential consumer to change their heating system in order to increase the territory's renewable energy levels.

    • Key Action:1
    • Language:en
    • Sectors: industry
    • Implementation timeframe:2013-2023
    Rate this benchmark: Votes
  • Implementing the local urban planning scheme for housing and travel
    • Description:

      This is the regulatory tool making it possible to define the territory's land-use rules. The local urban planning scheme will be constructed by 2030. Dijon metropole has wished to commit to a buid-in-vision of the mobility, urban planning, residential, economic and environmental developpment policies within the framework of implementing its local urban planning scheme.

    • Key Action:1
    • Language:en
    • Sectors: transport
    • Implementation timeframe:2015-2030
    • Implementation cost:900000
    Rate this benchmark: Votes
  • Energy transition of the vehicle fleet
    • Description:

      Dijon metropole has constructed two tramway lines which took shape in 2013, 100% electric of which 10% is supplied by a solar power plant located at the tramway's depot. Going forward, Dijon metropole has renewed 102 buses by purchasing hybrid buses (Euro5) which have made it possible to save 30% in energy consumption. Lastly, the collectivity has replaced the seven diesel-powered-city-centre shuttles with the introduction of five electric shuttles for the same level of service in 2017. What still needs to be done is replacing 65 buses by clean vehicules in order to achieve the fleet's 100% renewal.

    • Key Action:1
    • Language:en
    • Sectors: transport
    • Implementation timeframe:2010-2025
    • CO2 reduction:4100
    • Renewable energy produced:1200
    • Implementation cost:60000000
    Rate this benchmark: Votes
  • Reinforcing active mobility and encouraging the growth of shared mobility
    • Description:

      Dijon metropole has set itself the 2020 objective of achieving 10% (this modal share is currently at 3%) of the bicyle modal share and 30% (this modal share has been achieved) of the pedestrian modal share. To do so, Dijon metropole has developped an active policy for the developpment of bicycle use. Futhermore, Dijon metropole, by developping a certain number of actions such as supporting the developpment of car sharing, is developping the Divia pouce initiative that contributes to share vehicle use. The most recent actions are mainly communication, information and awarness-raising actions.

    • Key Action:1
    • Language:en
    • Sectors: transport
    • Implementation timeframe:2010-2024
    • Implementation cost:5000000
    Rate this benchmark: Votes
  • Hydrogen production and distribution station
    • Description:

      Dijon metropole create a hydrogen production and distribution station. The cost for the construction of the station is 6 960 000 € and the cost to buy 8 garbage trucks to beginning is 6 960 000 €; The goal is to be able to power 100 cars and 20 trucks, with a hydrogen consumption of 260kg per day. The electricity used to create hydrogen come from the energy recovery unit from waste treatment (90%) and from the solar power plant production near the site (100%)

    • Key Action:1
    • Language:en
    • Sectors: transport
    • Implementation timeframe:2019-2021
    • CO2 reduction:1034
    • Implementation cost:11700000
    Rate this benchmark: Votes
  • Preparing the territorial energy climate plan
    • Description:

      In 2010, Dijon metropole committed, along with the city of Dijon which signed the Covenant of Mayors, to preparing a territorial energy climate plan, thus anticipating national obligations, with the objective of reducing greehouse gas emissions by 20% by 2020, while increasing energy efficiency by 20% and achieving 20% of renewable energy in the energy mix. The territorial energy climate plan is updated every 4 years along with its action plan in order to assess the achievement of the set objectives. In 2017, Dijon metropole committed to reviewing its territorial energy climate plan by integrating the air component, now a national obligation.

    • Key Action:1
    • Language:en
    • Sectors: others
    • Implementation timeframe:2017-2020
    • Implementation cost:30000
    Rate this benchmark: Votes
  • Renwal of Cit'ergie certification
    • Description:

      In 2014, Dijon metropole was awarded Cit'ergie certification, which is the French variant of the European Energy Award. The collectivity renewed this certification in 2019. Il will assist the collectivity in defining the new action plan for its territorial air climate plan. It is also the latter's annual monitoring tool.

    • Key Action:1
    • Language:en
    • Sectors: others
    • Implementation timeframe:2019-2023
    • Implementation cost:50000
    Rate this benchmark: Votes
  • Construction a solar power plant
    • Description:

      Construction of a solar power plant on a site being reconverted that is currently used as a technical landfill centre for inert waste. It will extend over 15.6 hectares. It will be operational in 2021 : 44 000 solar panels for an annual production of 17 800 MWh, i.e. the annual consumption of 8 000 inhabitants

    • Key Action:1
    • Language:en
    • Sectors: local electricity production
    • Implementation timeframe:2016-2020
    • CO2 reduction:1400
    • Renewable energy produced:17800
    • Implementation cost:16000000
    Rate this benchmark: Votes
  • Developping solar power production for powering the tramway
    • Description:

      Dijon metropole currently covers 10% of its tramway consumption through the construction of a solar power plant located at the tramway's depot. This local production could be increased to 25% with the creation of a new solar power plants located along the tramway

    • Key Action:1
    • Language:en
    • Sectors: local electricity production
    • Implementation timeframe:2020-2024
    • CO2 reduction:148
    • Renewable energy produced:1800
    • Implementation cost:2600000
    Rate this benchmark: Votes
  • Creating a 70% renewable energy heating network
    • Description:

      Dijon metropole has committed to constructing a 70% renewable energy heating network which was unveild in 2013. Since then, the network has undergone several developpment projects. Furthermore, two existing heating networks on the territory have been conneted. Today, more than 60% of the energy of this new heating network is renewably sourced. The planned new expansion of the two heating network aims to continue administrative districts. Energy production will continue with a planned increase of 65 GWh per year. In 2016, the two networks were producing 325 GWh.

    • Key Action:1
    • Language:en
    • Sectors: local heat cold production
    • Implementation timeframe:2013-2023
    • CO2 reduction:90000
    • Renewable energy produced:500000
    • Implementation cost:1000000
    Rate this benchmark: Votes
  • Creating actual methanisation center
    • Description:

      Creating actual methanisation center in 2021 for treating 40 000 tons of inputs

    • Key Action:1
    • Language:en
    • Sectors: local heat cold production
    • Implementation timeframe:2016-2020
    • CO2 reduction:6400
    • Renewable energy produced:27000
    • Implementation cost:12000000
    Rate this benchmark: Votes
  • Increasing energy recover as heat from the waste treatment energy recovery unit
    • Description:

      Dijon metropole is going to increase energy recovery as heat from the waste treatment energy recovery unit (9 to 30 MWh) connected to the heating network.

    • Key Action:1
    • Language:en
    • Sectors: local heat cold production
    • Implementation timeframe:2018-2020
    • CO2 reduction:12370
    • Renewable energy produced:21000
    • Implementation cost:5000000
    Rate this benchmark: Votes
  • Reducing at-source waste
    • Description:

      An at-source waste reduction programme is set up with the objective of reducing household waste by 10% by 2020 and organic matter recycling by 55% by 2020. This programme is based aroud two areas : reducing the volume of household waste and encouraging the circular economy through the implementation of reuse schemes to combat food wastage, composting etc.. During the assessment of the action carried out midway through 2015, nearly 7% of savings had already been made.

    • Key Action:1
    • Language:en
    • Sectors: others
    • Implementation timeframe:2010-2020
    • CO2 reduction:2956
    • Implementation cost:3700000
    Rate this benchmark: Votes
  • Set up the sorting of the plastic waste
    • Description:

      Dijon metropole candidate to different calls to set up the sorting of the plastic waste on all the territory

    • Key Action:1
    • Language:en
    • Sectors: others
    • Implementation timeframe:2015-2020
    • CO2 reduction:15000
    Rate this benchmark: Votes
  • Metropolis and cities building retrofit
    • Description:

      Dijon metropolis integrate new solutions to reduce heat during the summer in their buildings. Some inovative solutions are in project in next retrofit. The objective is to deploy solutions at first in buildings where we have young and older population and in a second time in all buildings

    • Key Action:1
    • Sectors:
    • Implementation timeframe:2019-2030
    Rate this benchmark: Votes
  • Build new eco district
    • Description:

      Dijon metropolis build new eco districts with more biodiversity and green areas. Buildings are built with a particular attention (marterals, choice color etc..) Our local planning authorities certificated EMAS to build eco district

    • Key Action:1
    • Sectors:
    • Implementation timeframe:2009-2025
    Rate this benchmark: Votes
  • Implementation of a hot weather unit
    • Description:

      This unit, via a volontary register of elderly persons, help, advises and visits those registered

    • Key Action:1
    • Sectors:
    • Implementation timeframe:2001-2020
    • Implementation cost:150000
    Rate this benchmark: Votes
  • Identifying cool areas for guiding susceptible persons to them in case of hot weather
    • Description:

      Implementation of 60 sensors to characterise urban heat islands

    • Key Action:1
    • Sectors:
    • Implementation timeframe:2014-2020
    • Implementation cost:800000
    Rate this benchmark: Votes
  • Increase in urban revegetation
    • Description:

      shared gardens, roof gardens, tree bases, etc

    • Key Action:1
    • Sectors:
    • Implementation timeframe:2013-2020
    • Implementation cost:1500000