Key Actions

  • Solar
    • Description:

      all of solar system: This area concerns all the solar energy work done in the Tepebaşı Region. One of them is to provide 20% of the energy of Tepebaşı Municipality Service Building from solar panels. Besides the municipal service building, an energy efficient building work carried out in the municipal water sports center, Solar Powered Charging Stations and Solar Powered Animal Irrigation System can be given as an example.

    • Key Action:1
    • Language:en
    • Sectors: municipal buildings equipment facilities
    • Implementation timeframe:2014-2020
    • Implementation cost:236500
    Rate this benchmark: Votes
  • Living Village (solar PV system)
    • Description:

      Tepebaşı Municipality signed the EU covenant of Mayors in 2013 and committed itself to reduce carbon emissions in the city. Its objective is to reduce CO2 emissions 20% by 2020. The main objective in the energy efficiency phase of the project is to improve the existing buildings and make them energy efficient. The sub-breaks are the renewal of the building shells by sheathing, the renewal of the windows and joinery systems, the change of the air conditioning systems, the establishment of the Solar Power Plant, and the replacement of the building and environmental lighting with LED. The energy produced from the Solar Power Plant established in 2018 is 275000 kwh until the end of 2019.

    • Key Action:1
    • Language:en
    • Sectors: municipal buildings equipment facilities
    • Implementation timeframe:2018-2019
    • Renewable energy produced:233
    Rate this benchmark: 1 Votes
  • Water Sport Center (solar PV system)
    • Description:

      The Tepebaşı Municipality Water Sports Center is entitled to receive the Golden Certificate by taking sustainable analyzes, efficiency in water use, energy and atmosphere, indoor air quality, innovation and design stages with a score of 64 out of 110 points. The center is designed as an intelligent building and can utilize solar panels to meet 10% of electricity and 20% of heating energy. In the center, rain water is stored and these waters are used in garden irrigation. Water sports center built in accordance with world standards Through 11 light tubes located on the basement, natural light of the environment is realized by providing sun rays of 1 to 6 meters below the roof. The center buil

    • Key Action:1
    • Language:en
    • Sectors: municipal buildings equipment facilities
    • Implementation timeframe:2012-2013
    • Renewable energy produced:104
    Rate this benchmark: 1 Votes
  • Solar Pv roof
    • Description:

      citizens solar pv: Solar Powered Charging Stations: One of the important services of Tepebaşı Municipality is the Solar Energy Charging Stations store the energy generated by the 60 W power solar panels and provide charging services throughout the day. Solar Powered Animal Irrigation System: In two regions of Tepebaşı Municipality, the problem of water in the region is solved by using solar energy. According to the system constructed, the solar energy obtained by the solar panels is kept in the pond and this energy enables the water motor and the pump to work.

    • Key Action:1
    • Language:en
    • Sectors: local electricity production
    • Implementation timeframe:2015-2020
    • CO2 reduction:4.137
    • Renewable energy produced:5.91
    • Implementation cost:13103
    Rate this benchmark: Votes
  • Living Village hybrid vehicle (22 hybrid)
    • Description:

      Diesel cars were replaced with 22 hybrid vehicles and currently being used. Hybrid vehicle has 1.5 L gasoline engine with 77 horsepower and 10 kW electric engine at the same time. It should be noted that, there is no need to charge this electric engine, it recharge itself with waste heat and gasoline. In total, 22 hybrid vehicle will save 8.224 Liter of fuel and avoid 26.796 kg of CO2 emissions annually.

    • Key Action:1
    • Language:en
    • Sectors: transport
    • Implementation timeframe:2015-2018
    • CO2 reduction:13.46
    • Implementation cost:1850000
    • Website: http://www.tepebasi.bel.tr/remourban/Ulasim.html
    Rate this benchmark: Votes
  • Living Village (4 electrical bus)
    • Description:

      First electric buses in Turkey were purchased within the scope of REMOURBAN project. E-Bus has 200 kW electric engine and its range can go up to 300 km. In total, 4 electric buses save 212.400 kWh annually and avoid 61.200 kg CO2 emissions. 4 e-buses were deployed and already in use. E-Bus can be charged 6 to 8 hours with e-bus charging device that is placed next to municipality main service building. E-Bus charging station has 380 Volt power and it turns AC power to DC power and charge the e-bus. Also, station has smart meter so that consumption and other information are available. Charging station device has 16,24 and 32 kW charging power option.

    • Key Action:1
    • Language:en
    • Sectors: transport
    • Implementation timeframe:2015-2018
    • Website: http://www.remourban.eu/
    Rate this benchmark: Votes
  • Living Village (bicycle)
    • Description:

      30 E-bikes were purchased. E-bike has 250 Watt electric engine and 36 Volt & 8000 milliampere battery. Besides it has 50 km range. E-bike charging stations have 45 charging units in total. In addition, there will be 3 pay stations and stations can run 3 hours without electricity. 6.8 km bicycle path, which is aimed to expand bicycle usage in order to decrease the traffic density and CO2 emissions, was approved by Transportation Coordination Centre’s.

    • Key Action:1
    • Language:en
    • Sectors: transport
    • Implementation timeframe:2015-2018
    • Website: http://www.remourban.eu/
    Rate this benchmark: Votes
  • Central Municipal Building (Solar Pv system)
    • Description:

      The Energy Efficient Building Project for Low Carbon Footprint, which was realized in the Municipal Main Service Building in 2010, resulted in a 30% increase in productivity by simulating and automating heating and cooling systems. With solar panels installed in the roof of the 2011 service building, the building has become able to meet 20% of its energy needs. In this direction, Tepebaşı Municipality Service Building became the first energy-efficient public building of Eskisehir.

    • Key Action:1
    • Language:en
    • Sectors: municipal buildings equipment facilities
    • Implementation timeframe:2011-2013
    • Renewable energy produced:873
    Rate this benchmark: Votes
  • REMOURBAN Solar Power Plant
    • Description:

      Tepebaşı Municipality signed the EU covenant of Mayors in 2013 and committed itself to reduce carbon emissions in the city. Its objective is to reduce CO2 emissions 20% by 2020. The main objective in the energy efficiency phase of the project is to improve the existing buildings and make them energy efficient. The sub-breaks are the renewal of the building shells by sheathing, the renewal of the windows and joinery systems, the change of the air conditioning systems, the establishment of the Solar Power Plant, and the replacement of the building and environmental lighting with LED. The energy produced from the Solar Power Plant established in 2018 is 275000 kwh until the end of 2019.

    • Key Action:1
    • Language:en
    • Sectors: municipal buildings equipment facilities
    • Implementation timeframe:2018-2020
    Rate this benchmark: Votes